here I got genuine sellers for IRON ORE 63.5% CNF & FOB basis .
For CNF basis , the seller is ready to give shipment within 20 to 30 days period after the receipt of the L/C in his account , seller will pay 2% non-operative PG with in 24 hours period time after the receipt of the signed contract with L/C draft from buyer side . the sellers rate for CNF basis US$81 net . here is the specification :
CHEMICAL COMPOSITION {on dry basis}
Fe: 63.5% basis { below 62.5% REJECTED }
Al203 : 3.0%{MAX}
Si02 : 3.50% {MAX}
Sulphur : 0.06% {MAX}
Phosphorus : 0.06% {MAX}
Free moisture loss at 105 degrees centigrade : 8.00 % { MAX}
PHYSICAL COMPOSITION {on natural basis}
+ 10 mm : 5%?:{MAX}
0-10 mm : 95%:{MIN}
-0.15mm : 5%:{MAX}
IRON ORE for FOB basis
One of my seller is ready to give the material with in 7 to 10 days after the receipt of the L/C in his account , the seller got 40,000*2=80,000mts in two different ports .
US$ 54 net for seller
If you are interested to do a business with me , please write me in details