We are the one of the leading sensor manufacturer called as GE Infrastructure Sensing solution. Now we have a requirment on 22AWG XLP UL 3321 wire. Annual requirment will be arround 500Kilo meters. Now we are in sample stage. Continues production will be starting from 2004 November. Initially we are looking for 1000Mtrs for samples.
We would like to get a quote for production lot and samples lot with terms and conditions.
Attached our specification.
|
|
| 本信息价值 5 点积分,建议回复日期 2004-06-26 之前, 还可被浏览 0 次 |
 |
|
|